
01
Semi-Logarithmic Scale
The chart is semi-logarithmic: time runs along a normal, evenly spaced axis of calendar days, while count per minute runs up a logarithmic axis. On a log axis, equal distances mean equal ratios. Doubling from 5 to 10 per minute covers the same height as doubling from 50 to 100, so a learner's progress looks the same wherever it starts.
An ordinary equal-interval graph hides this: going from 50 to 100 looks ten times bigger than going from 5 to 10, even though both are the same ×2 change in behavior.
- Dot
- Correct responses per minute in one timing.
- ×
- Errors per minute in that same timing.
- Aim line
- The target rate. Here, 40 correct per minute.
- Record floor
- The lowest nonzero rate a timing can record: 1 ÷ counting time. For a 1-minute timing, 1 per minute.
- Gaps
- Days without a timing stay empty. Calendar time keeps moving whether or not you study.
Sources: Lindsley (1992); Standard Celeration Society.
02
Celeration Multipliers
Celeration is change in rate per unit of time: here, how much your count per minute multiplies each week. Acceleration is written as a multiplier, such as ×2 or ×4, for skills you want to grow. Deceleration is written as a divisor, such as ÷2 or ÷4, for errors or interfering behavior you want to shrink.
×2 / week: 10 → 20 → 40 per minute over two weeks÷2 / week: 8 → 4 → 2 errors per minute over two weeks
The celeration line is fitted through the dots, and its angle tells the story. Because the chart's proportions are standard, a ×2-per-week line always rises at about 34° (33.5° on the standard 8 × 5.28 grid, SCS 1998). Corrects climbing while errors fall, an “X-jaws” pattern, is the picture of learning. A flat corrects line for a week or more says change something, and the change is marked with a phase-change line so its effect can be seen.
Source: Kubina & Yurich (2012).